Real-time monitoring of the point where the pipeline meets the seabed during pipelay, to control its position and document the as-laid condition as installation progresses.
The verified final position of installed pipelines and structures, with coordinates and kilometer points (KP), reports and drawings ready for project engineering close-out.
With the Leopard we verify the installation of manifolds, valves and umbilicals, perform structural inspection during the works and provide continuous subsea positioning to the operation.
Tell us about your scope, location and timeline. We respond within one business day.